2004-2005
Certification Courses
Design
of Stormwater Pollution Prevention Plans
$285 8:00 a.m. - 4:30 p.m. Includes Written Exam
This two-day course is for those who are involved with the design
of stormwater pollution prevention plans. The course will focus
on the design elements to be included in the plan. The course covers
permit requirements, design standards, specifications, and special
provisions. Also included are design detail drawings, standard
plates, and standard sheets. The course emphasizes selection and
design of appropriate best management practices (BMPs), proper
location of BMPs, and application of bid payment items. Permanent
and temporary erosion/sediment control design elements as well
as establishment of temporary or permanent vegetative cover will
be covered. Other subjects include the permit application process,
soil erodibility, channel stabilization techniques, an overview
of soil bioengineering methods, and new methods/devices for controlling
erosion and sedimentation. This course is taught entirely in the
classroom.
Who
should attend:
Agency: Mn/DOT and local highway agency Squad Leaders,
Engineers, Engineering Specialists, and Technicians who prepare
or oversee the preparation of stormwater pollution prevention
plans.
Contractor: Design team leaders, Engineers,
Engineering Assistants, and Technicians who prepare or oversee
the preparation of Consultant and/or Design/Build stormwater pollution
prevention plans.
| ED301 |
Dec. 13-14, 2004 |
White Bear Lake-Best Western White Bear Country Inn |
| ED302 |
Dec. 15-16, 2004 |
Worthington-Travelodge/Stephanie's |
| ED303 |
Jan. 4-5, 2005 |
Arden Hills-Mn/DOT Training and Conf.
Center |
| ED304 |
Jan. 6-7, 2005 |
St. Cloud-Mn/DOT Conference Center |
| ED305 |
Jan. 11-12, 2005 |
Moorhead-Courtyard by Marriot & Moorhead
Area Conf. Center |
| ED306 |
Jan. 24-25, 2005 |
Arden Hills-Mn/DOT Training and Conf.
Center |
| ED307 |
Apr.
13-14, 2005 |
Mankato-Technology
Plus |
Contact us: 612-625-9733 or 800-646-2282
|